Projects

Projects

Confident that we can exceed your expectations. Let’s connect and discuss how we can help you achieve your target and objective.

Bangladesh Coast Guard

Supply, Installation, testing and commissioning of separate 16.24 kWp [DC] Hybrid Off-Grid Solar/ BESS System at two BCG West Zone Outposts. Namely Kokilmani and Dubla Char.

Read More

Payra Port Authority

Supply, Installation, testing and Commissioning of 142.5 kWp On-Grid Solar System on rooftop of different buildings at Payra Port Patuakhali.

Read More

Sonali Bank Ltd.

Supply, Installation, testing and Commissioning of different capacities Genset with maintenance support

Read More

Civil Aviation Authority of Bangladesh (CAAB)

We provided standby power systems for international and select domestic airports in Bangladesh, featuring adequately sized standby diesel generators

Read More

Bangladesh Telecommunication Company Ltd.

Supply, Installation, testing and Commissioning of 500 KVA Diesel Generator with maintenance support.

Read More

ERICSSON-AB

Supply, Installation, testing and Commissioning of 200 X 40kVA Diesel Generator with maintenance support.

Read More

Bangladesh Power Development Board (BPDB)

We performed rehabilitation work on a 150MW Liquid Fuel Gas Turbine, including hot section refurbishment and complete overhauling, to enhance the plant’s fuel efficiency.

Read More

Bangladesh Power Development Board (BPDB)

We were co-owner of 55MW Natural Gas fired Power Plant at Ashuganj. The plant was powered by MWM gas engine with an ISO capacity of 60MW.

Read More

Bangladesh Army

Supply and Installation of Different capacities Diesel Generators for various army installations.

Read More

Bangladesh Navy

Supplied Equipment:
1. Installed 5 Under Vehicle Scanning Systems (UVSS)
2. Supplied Handheld Explosive Detectors
3. Supplied and Integrated Intelligence equipments
4. Supplied and Integrated Unmanned Aerial Vehicles (UAVs)

Read More

Midland East Power Ltd.

150 MW HFO Power Plant at Ashuganj:
We proudly completed the EPC work for the 150 MW HFO Power Plant, partnering with CRRC Ziyang Co., Ltd., China. This project is fully commissioned, the warranty period has ended, and it is now operating successfully, showcasing our commitment to excellence and innovation. It is considered an iconic plant in the country!

Read More

Overhauling of 210MW Chittagong Power Station:

We managed and successfully completed the contract for overhauling a 210 MW thermal power plant with our Principal contractor, Dongfang Electric International Corporation. The project was completed on time, meeting all requirements, and the plant was put on successful operation upto entire satisfaction of Bangladesh Power Development Board [BPDB].